Sixteen days after getting back from The Unified Group’s 2015 Annual Meeting, Jack Fanneron and John Losey (along with Matt Losey) made the drive to Boston to visit with Cox Engineering. The two Unified Group members met to review both of their business operations, the PIPES process and dash boards that BP Group presented at the Annual Meeting, Cox’s plant manufacturing operations, service operations, and mechanical operations.

“It was a great day,” said Jack Fanneron (BP Group). “Cox has a great team and a really cool business model which is diversified and attractive.”